Exploded ViewWork Flow (Without EXP-800 NI and GR8-1200 NI)
Before performing a alternator test, make sure that the 12V battery is fully charged. A 30-volt voltmeter and suitable test probes are necessary for the test.
Before starting, inspect the fusible link.
Use fully charged 12V battery.
OVERALL SEQUENCE
DETAILED FLOW
PRELIMINARY INSPECTION
Perform the ...
Removal and Installation
REMOVAL
Remove cowl top cover. Refer to Removal and Installation.
Remove front wiper drive assembly mounting bolts .
Disconnect front wiper drive assembly harness connector and remove harness clip, and then remove front wiper drive assembly.
CAUTION:
Never drop front wiper motor or cause it to co ...
Measurement with Manual Gauges
(1) MEASUREMENT WITH TRACKING GAUGES
Three types of deformations, side-sway, diamond and buckling, can be measured.
(a) Side-sway
This is checked by measuring the dimensions of the respective crossmember diagonal lines and comparing them to see if any differences are present.
(b) Diamond
Measure ...