Inspection
Work FlowService
Never use electrical test equipment to check SRS circuits unless instructed to in this Service Manual.
Before servicing the SRS, ignition switch OFF, disconnect battery negative terminal and wait 3 minutes or more.
For approximately 3 minutes after the cables are removed, it is still possible for th ...
Inspection
INSPECTION AFTER REMOVAL
Check dust boot clamp (looseness and disconnection) and dust boot (scratches, cracks, and holes). Replace the lower joint, as necessary.
Check each part of lower joint for damage and other malfunctions. Replace if there is a malfunction.
Check each part of steering shaft for ...
Inspection and Adjustment
INSPECTION BEFORE INSTALLATION
Be sure to check dimension (A) to ensure it is within the reference value limit.
B : Scale C : Straightedge
Dimension (A) : Refer to Torque Converter.
INSPECTION AFTER INSTALLATION
Start the engine and check visually that there is no leakage of ATF.
Check A/T ...