Removal and Installation
Removal and InstallationProcess of Spot Welding
It takes 3 processes, “pressurization”, “energization”, and “retention”, to complete the spot welding.
(1) PRESSURIZATION
The welding points of overlapped panels are pressurized with the tip (electrode) for close contact.
With the panels contacting closely, the current can run intensive ...
Diagnosis Procedure
CHECK FRONT POWER WINDOW MOTOR (PASSENGER SIDE) POWER SUPPLY AND GROUND CIRCUIT
Check front power window motor (passenger side) power supply and ground circuit. Refer to Diagnosis Procedure.
Is the inspection result normal?
YES>>
GO TO 2.
NO>>
Repair or replace the malfunctioning pa ...
Disassembly and Assembly
WHEEL SIDE
Disassembly
Fix shaft with a vise.
CAUTION:
Protect shaft when fixing with a vise using aluminum or copper plates.
Remove dust shield from joint sub-assembly.
Remove boot bands and then remove boot from joint sub-assembly.
Screw the drive shaft puller (commercial service tool) (A) 30 mm ...