While hammering work is being performed during the rough repair stage, the area needs to be heated. First, cover your hand with a glove (cloth material), and then place hand on the reverse side of the panel near the repair area. Apply heat to the entire repair area using a gas burner (oxy-acetylene gas welder) until your covered hand feels heat.

WARNING:
The panel may crack when hammered without sufficient heat being applied.
Hammering
ShrinkingWork Procedure
WRITING VEHICLE SPECIFICATION
With CONSULT
Perform writing vehicle specification to combination meter following "Automatic Configuration" procedure of "Configuration" according to CONSULT Operation Manual.
NOTE:
Log in the network according to CONSULT guidance.
>>
WORK END ...
Removal and Installation
WARNING:
REMOVAL
The ignition switch OFF.
CAUTION:
Wait for 60 seconds after the ignition switch OFF.
Disconnect negative battery terminal. Refer to Removal and Installation
Disconnect the transfer control actuator connector .
Remove harness clip .
Remove transfer control actuator mounting bolt ...
Inspection
INSPECTION AFTER INSTALLATION
Fuel Leakage Inspection
Check for fuel leakage according to the following procedure.
Turn ignition switch ON (with engine stopped). With fuel pressure applied to fuel piping, check for fuel leakage at the locations where parts are removed and reinstalled.
NOTE:
Use a m ...